New cooling installation for waste incineration plant

Our customer is a waste management company and had to contend with insufficient cooling capacity with the current waste incineration.

The Timmerman-EHS team dismantled the old cooling installation and replaced it with a new cooling system. New pipelines were connected and a new platform was installed.


 